Key Art of "Summer of Rockets" featuring Keeley Hawes and Toby Stephens.

Summer of Rockets

Start watching
6HWbNHN-show-poster2x3-c7tgE2Y.png

Artbound

Start watching
FZG3mkG-show-poster2x3-nOossfs.png

SoCal Update

Start watching
Death in Paradise Series 10

Death in Paradise

Start watching
millionaire still

KCET Must See Movies

Start watching
MZihTLV-show-poster2x3-5CKaGu8.jpg

Independent Lens

Start watching
MJ250sC-show-poster2x3-Bflky7i.png

Tending Nature

Start watching
Southland Sessions

Southland Sessions

Start watching
HvlSxHY-show-poster2x3-4ik43uV.png

Earth Focus

Start watching
City Rising

City Rising

Start watching
Lost LA

Lost LA

Start watching
Member
Your donation supports our high-quality, inspiring and commercial-free programming.
Support Icon
Learn about the many ways to support KCET.
Support Icon
Contact our Leadership, Advancement, Membership and Special Events teams.

Blythe Solar Project May Be Built With FirstSolar Panels

Support Provided By
BlythesolarandMcCoys-thumb-600x400-36915

Blythe Solar Power Project from the air, November 2011 | Photo: Chris Clarke/KCET

Thin-film photovoltaic panel manufacturer First Solar may have an in for supplying solar panels for the one gigawatt Blythe Solar Power Project, according to documents project developer NextEra submitted to the California Energy Commission (CEC) last week.

The solar project, on 5,950 acres of public land west of Blythe, California, was picked up by Florida-based NextEra after its initial developer, Solar Millennium, field for bankruptcy in April.

Originally proposed as a parabolic trough concentrating solar thermal facility, the Blythe project was stalled after PV prices started to drop in 2009-10. In 2011, Solar Millennium told the CEC it was heading back to the drawing board, redesigning the site to use much more cost-effective photovoltaics.

According to reporter Christopher Martin at Bloomberg, NextEra is looking at cadmium telluride thin-film PV as a possible technology on which to base the reconfigured project, but the company hasn't officially settled on which flavor of PV it will use -- or on a supplier (or suppliers) for said PV.

FisrtSolar isn't commenting on a possible deal either, though its stock rose 11% after Bloomberg broke the story. But if NextEra does go with cadmium telluride as its PV tech of choice, FirstSolar will likely be first in line as a potential supplier. FirstSolar is the largest manufacturer of cadmium telluride PV in the country, and may well be the only one with the capacity to supply a gigawatt's worth of panels.

Besides, the companies have already worked together: FirstSolar sold the Desert Sunlight project near Joshua Tree National Park to NextEra, and is competing that plant's construction.

ReWire is dedicated to covering renewable energy in California. Keep in touch by liking us on Facebook, and help shape our editorial direction by taking this quick survey here.

Support Provided By
Read More
Singer, dancer and activist Nobuko Miyamoto holds her hands out.

We Are All Part of Many Worlds: Nobuko Miyamoto’s Barrier-Breaking Art and Activism

In her decades of activism, Nobuko Miyamoto has bridged the divides of art forms and race in a quest for social justice.
A  medical technician wears a face mask at a drive-thru testing site for COVID-19.

As California Reopens, Six Things You Need to Know About COVID-19

Around 1,000 Californians are still newly infected every day, hospitalizations have hit a new low, people of color remain at high risk and almost half of eligible people aren’t fully vaccinated.
California Gov. Gavin Newsom speaks during a news conference at San Francisco General Hospital  on June 10, 2021 in San Francisco, California.

California Leaders File Appeal To Preserve State's Assault Weapons Ban

U.S. District Judge Robert Benitez of San Diego issued a ruling that overturned the decades-old ban last week, comparing the assault weapons to Swiss Army knives.