xHgGrtG-show-poster2x3-aXpIxNN.png

Artbound

Start watching
Tending Nature show poster

Tending Nature

Start watching
IYhnPQZ-show-poster2x3-Ytk6YwX.png

Southland Sessions

Start watching
RYQ2PZQ-show-poster2x3-OGargou.jpg

Earth Focus

Start watching
5LQmQJY-show-poster2x3-MRWBpAK.jpg

Reporter Roundup

Start watching
E5VnHdZ-show-poster2x3-PrXshoo.png

City Rising

Start watching
QraE2nW-show-poster2x3-uY3aHve.jpg

Lost LA

Start watching
Member
Your donation supports our high-quality, inspiring and commercial-free programming.
Support Icon
Learn about the many ways to support KCET.
Support Icon
Contact our Leadership, Advancement and Special Events teams.

First Solar to Sell More Power From Central Valley Area

CstSte_6321_FS_CA_WB_M-thumb-600x374-35878

Building utility-scale PV in the California desert | Photo courtesy First Solar

Photovoltaic panel manufacturer First Solar has announced that it will be selling power from two mid-sized utility-scale solar facilities to Pacific Gas and Electric (PG&E), as long as the California Public Utilities Commission gives the agreement its thumbs-up. The Lost Hills Solar Project in northwestern Kern County and the Cuyama Solar Project in the northeasternmost margin of Santa Barbara County will supply up to 72 megawatts of solar photovoltaic power to the Northern California utility.

Both projects are sited on land that has been farmed for some time. The 32-megawatt Lost Hills site, about 7 miles west of the unincorporated community of Lost HIlls near Wasco, is on land that has been fallowed. The Cuyama site is about 60 miles south, in a small valley near the south end of the San Joaquin Valley, on land now being used to grow carrots, onions, and potatoes.

If the CPUC approves the power purchase agreement between FirstSolar and PG&E, as is likely, the projects will start delivering power in 2019.

First Solar's announcement comes a day after the company marked a world record: its Agua Caliente solar project in Yuma County, AZ is officially the largest grid-tied photovoltaic project in the world, at 250 megawatts of capacity. Still under construction, Agua Caliente will reach a 290-megawatt capacity when completed in 2014.

These announcements are some much-needed good news for First Solar. The nation's largest provider of photovoltaic panels, First Solar has taken a bit of a beating on the stock market over the last few years as it struggles to transform itself from a solar panel supplier to a fully vertically integrated builder of utility-scale PV projects.

The Lost HIlls and Cuyamaca projects may signal another trend in the making: mid-range utility scale projects below 50 megawatts, built on previously disturbed land closer to power demand and transmission than some of the large desert projects now being built.

ReWire is dedicated to covering renewable energy in California. Keep in touch by liking us on Facebook, and help shape our editorial direction by taking this quick survey here.

Support Provided By
Support Provided By
Read More
People pull up in their vehicles for Covid-19 vaccines in the parking lot of The Forum in Inglewood, California on January 19, 2021. | FREDERIC J. BROWN/AFP via Getty Images

L.A. County Expands COVID Vaccines to Residents 65 And Older

L.A. County began scheduling COVID-19 vaccination appointments for those aged 65 and older today, but limited supplies and uncertainty about future allocations has left the inoculation effort shrouded in doubt.
Bill Kobin - hero image

Public Media and KCET Legend Bill Kobin Dies at 91

William H. “Bill” Kobin, a public media icon who helped build PBS flagship station KCET into a Los Angeles powerhouse, airing news programs like the acclaimed “Life & Times” and helping to launch Huell Howser’s career, has died.
Pupils listen to school lessons broadcast over a solar radio in Dalu village, Tana River County, Kenya, November 28, 2020. | Thomson Reuters Foundation/Benson Rioba

With Schools Shut by Pandemic, Solar Radios Keep Kenyan Children Learning

Solar-powered radios have been distributed to the poorest homes that lack electricity access, with lessons broadcast daily during the COVID-19 crisis — and perhaps beyond.