Muhammad Ali

Muhammad Ali

Start watching
Fine Cut

Fine Cut

Start watching
SoCal Update

SoCal Update

Start watching
a large damn with graffiti of a woman with a hammer on it, mountains in the background

Earth Focus Presents

Start watching
Southland Sessions

Southland Sessions

Start watching
Professor T

Professor T (Belgium)

Start watching
Artbound

Artbound

Start watching
Emma

Emma

Start watching
Guilt

Guilt

Start watching
Line of Separation Key Art.

Line of Separation

Start watching
Us

Us

Start watching
The Latino Experience

The Latino Experience

Start watching
Key Art of "Summer of Rockets" featuring Keeley Hawes and Toby Stephens.

Summer of Rockets

Start watching
Death in Paradise Series 10

Death in Paradise

Start watching
millionaire still

KCET Must See Movies

Start watching
Independent Lens

Independent Lens

Start watching
MJ250sC-show-poster2x3-Bflky7i.png

Tending Nature

Start watching
Earth Focus

Earth Focus

Start watching
City Rising

City Rising

Start watching
Lost LA

Lost LA

Start watching
Member
Your donation supports our high-quality, inspiring and commercial-free programming.
Support Icon
Learn about the many ways to support KCET.
Support Icon
Contact our Leadership, Advancement, Membership and Special Events teams.

Desert High-Speed Rail Stays On Track: Groundbreaking Could be in a Year

Support Provided By
Image via DesertXpress

The high-speed rail that will carry passengers back and forth from the city of bling to the California high desert passed a major Federal junction.

The Federal Railroad Administration released its final environmental report on the Las Vegas to Victorville route Friday, placing the proposed $6 billion DesertXpress one step closer to breaking ground.

U.S. Senator Harry Reid of Nevada and U.S. Department of Transportation Secretary Ray LaHood reintroduced the project, and the 30,000 construction jobs it would create (mostly in Nevada's Clark County), plus the high profile reality it gives to President Obama's high-speed rail initiatives.

Map of Route | Image via DesertXpress

"In a time of enormous economic challenges it will create quality jobs, good paying jobs," said Lahood at a press conference held at UNLV. "This is the same promise that high-speed rail holds for communities across America. And we're starting right here in Las Vegas."

The passenger-only rail system will travel speeds reaching 150 miles per hour on a new grade-separated dedicated double track along I-15. The trip from strip-to-station will take 80 to 85 minutes.

The announcement may also heat up regional lobbying for the Las Vegas station, a location not yet selected. Victorville will be the site for the California station. A future westward link would extend the route to Palmdale, connecting it to California's planned high-speed rail project.

Not cooling down are the Southern California cities that will be bypassed by the route. Opposing the DesertXpress is the city of Barstow, located 34 miles north of Victorville.

According to an economic study commissioned by the city, traffic traveling to and from Las Vegas through Barstow will decrease by up to 33 percent resulting in the loss of 2,295 jobs once the train is running, and that Barstow Councilman Tim Silva is still committed stop the train's progress, reports the Desert Dispatch.

The 6-year project has been privately funded, said DesertXpress CEO Andrew Mack after the conference, before confirming they applied for federal loans up to $4.9 billion through the Railroad Rehabilitation & Improvement Financing program, according to the Las Vegas Sun.

On July 2, 2009, LaHood announced the California high-speed rail corridor would extend to Las Vegas, which provided a path to federal funding and loans dedicated for the development of railroad infrastructure.

It is estimated the project can break ground in two years once Federal Railroad Administration gives final approval.

Taking on the spirit of the trip from Las Vegas to Victorville, Sen. Reid cut the estimated 2-year time in half by stating ground breaking could happen as early as a year from now.

Support Provided By
Read More
Three people stand looking at the destroyed landscape after a mudflow, one woman has her hands on her head

What Happens After a Mudflow Destroys Your Home? The Hidden Costs of Rebuilding Post-Fire

Even after a wildfire is fully suppressed, the danger may not be over. Fires increase the likelihood of devastating mudflows after a rain. And unforeseen costs place financial burdens on those looking to rebuild.
Operations Section Chief Jon Wallace wearing a yellow jacket looks at and reached out to touch the protective foil wrapping around a big sequoia tree called General Sherman at Sequoia National Park, California

California Moves on Climate Change, but Rejects Aggressive Cuts to Greenhouse Emissions

Drought, wildfires, extreme heat: California lawmakers cast climate change as the culprit in an emerging series of public health threats, setting aside billions to help communities respond. But they stopped short of more aggressively reducing the state’s share of the greenhouse emissions warming the planet.
A wide shot of families walking along the concrete banks of the LA river with a bridge in the background

Near, Far, Wherever They Are, Angelenos Love the L.A. River

In a new, multilingual poll, 91% of L.A. residents supported river revitalization, while only 48% of those would support a tax increase to do it. Meanwhile, 76% of respondents prioritized ensuring that revitalization projects don’t displace locals.